Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Certification : | CE ISO |
Price : | negotiate |
Payment Terms : | L/C, T/T |
Supply Ability : | 10 sets/month |
Delivery Time : | 15 days |
5M Used Plastic Woven Bag PP Flat Yarn Polystyrene Extrusion Line
Descripition:
UW-Z Plastic flat wire drawing machine introducing and absorbing
advanced technology from Germany, PLC program control, frequency
control and other advanced technologies. The main electrical
components are used foreign high-quality products; extruder screw
barrel adopts special processing 38CrMoAIA quality steel; cold
water tank made of high quality stainless steel plate manufacture,
seven roll drawing machine gear box, monofilament drawing and
stereotypes adopt advanced hot air oven, so that the unit's main
technical indicators reached the international advanced level, its
fast, high yield, low energy consumption, good forming quality of
the monofilament. The entire unit compact structure, attractive
appearance, smooth running, flexible and reliable control,
sophisticated manufacturing technology, easy to operate, safe and
reliable.
Technical Parameters:
Item | UW-Z75x33-800 | UW-Z90x33-1100 | UW-Z100x33-1300 | UW-G120x33-1500 |
Max.extrusion volume | 140kg/h | 250kg/h | 290kg/h | 500kg/h |
Screw Dia | 75mm | 90mm | 100mm | 120mm |
Ratio of L/D | 33:1 | 33:1 | 33:1 | 33:1 |
Rotate speed of screw | 20-100r/min | |||
Length of mold lip | 800mm | 1100mm | 1300mm | 1500mm |
Line spee | 220m/min | |||
Flat yarn fibre scope | 60-200tex | |||
Drawing ratio | 4-10 | |||
Winder | 128 Spindles | 184 Spindles | 224 Spindles | 256 Spindles |
Photos:
FAQ:
1. Are you trading company or manufacturer?
We are manufacturer, and also provide the business solution to all
the friends.
2. What's payment terms you accept?
The buyer make the 30% deposite,the 70% balance will be paid by TT
within 7 days before delivery or the buyer open 100% irrevocable
L/C at sight as the appointed bank of the seller.
3. What's the delivery time?
The seller will arrange shipment within 90working days once confirm
the order.
4. How to install and debug the machine after arrival?
We will provide instructions and installation videos. If the Buyer
needs engineers to install in the local area, the buyer should pay
USD150 per day for subsidy of engineers and afford the charge of
daliy life(including the daliy meal ,traffic and hotel) in the
locus of buyer and return tickets from China to User's factory.
5. Does it easy to operate and what can i do if it doesn't work?
First ,our machine is stable and easy to operate by one man ,what
you do is just learn some basic thing. And we will sent you manual
and video ,we suggest you to come to visit our factory to learn
more thing by yourself , and if there is something goes wrong , you
can call us ,video-chat ,email us . And we will give solutions
within 36 hrs .Our engineer also can be distributed to overseas as
you required.
6. How long is your machine's warranty period?
Seller warrants the products for 13 months from the B/L date.
![]() |