Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Certification : | CE ISO |
Price : | negotiate |
Payment Terms : | L/C, T/T |
Supply Ability : | 10 sets/month |
Delivery Time : | 15 days |
2020 1M Used Precision Double Extruder Extrusion Coating Lamination Machine for OPP Film
Descripition:
Won the national invention patent OPP double-sided automatic plate laminating machine, adopted the vector frequency conversion technology of OPP film unreeling automatic control, and the use of hi-tech servo control, synchronization control, electric control, color code sensor on the version and other advanced technology. Equipment performance up to the advanced world level, solve the high-end packaging products, improve the grade of product packaging and security capability. Suitable for woven bag cylinder double bonded OPP films and automatic version of the film as well as ordinary film. This product has applied for national patent, lmitation will be investigated for legal responsibility.
Main Technical Parameter:
Item | UW-Z95-900 | UW-Z100-1600 | UW-Z120-2400 | UW-Z150-3600 |
Die lip width | 1000mm | 1650mm | 2500mm | 3700mm |
Width of product | 200-850mm | 800-1500mm | 1000-2400mm | 2000-3500mm |
Max coating speed | 236m/min | 236m/min | 130m/min | 100m/min |
coat thickness | 0.008-0.03mm-0.05 | |||
Screw diameter | 95mm | 100mm | 120mm | 150mm |
Ratio of L/D | 30:1 | 30:1 | 30:1 | 30:1 |
Max. roll diameter of unwinding and winding | 1100mm | 1200mm | 1200mm | 1200mm |
Overall sizes (L*W*H) | 158000×7500×2300mm | 16800×11000×2800mm | 13300×13000×3200mm | 14800×14000×3400mm |
System installed capacity | 130kw | 150kw | 260kw | 300kw |
Machine Photo:
FAQ:
1. Are you trading company or manufacturer?
We are manufacturer, and also provide the business solution to all
the friends.
2. What's payment terms you accept?
The buyer make the 30% deposite,the 70% balance will be paid by TT
within 7 days before delivery or the buyer open 100% irrevocable
L/C at sight as the appointed bank of the seller.
3. What's the delivery time?
The seller will arrange shipment within 90working days once confirm
the order.
4. How to install and debug the machine after arrival?
We will provide instructions and installation videos. If the Buyer
needs engineers to install in the local area, the buyer should pay
USD150 per day for subsidy of engineers and afford the charge of
daliy life(including the daliy meal ,traffic and hotel) in the
locus of buyer and return tickets from China to User's factory.
5. Does it easy to operate and what can i do if it doesn't work?
First ,our machine is stable and easy to operate by one man ,what
you do is just learn some basic thing. And we will sent you manual
and video ,we suggest you to come to visit our factory to learn
more thing by yourself , and if there is something goes wrong , you
can call us ,video-chat ,email us . And we will give solutions
within 36 hrs .Our engineer also can be distributed to overseas as
you required.
6. How long is your machine's warranty period?
Seller warrants the products for 13 months from the B/L date.
![]() |